A business offers an item to 54 independent potential customers. At price t units, each buys with probability 1−26t, for 0≤t≤26. The item costs 6 units per sale and the business has a fixed cost of 50 units. Let X be the number of sales and Π the net profit.
A test service operated for t hours generates revenue R(t)=t+3288t units, where t≥0. Running the service costs 6 units per hour. There is no fixed cost.
Worked solution
(a) Limiting revenue 288 units; half is achieved at t=3 hours. [3 suggested marks]
The horizontal asymptote of R is y=288.
Solve t+3288t=2288 to obtain 2t=t+3.
(b) R′(t)=(t+3)2864>0 for t≥0. [3 suggested marks]
Apply the quotient rule: R′=(t+3)2288(t+3)−288t.
The positive derivative means total revenue increases with operating time, although the marginal revenue decreases.
(c) 9 [4 suggested marks]
P(t)=R(t)−6t, so P′(t)=(t+3)2864−6.
Since t+3>0, solving P′=0 gives t+3=6864=12.
Thus t=9. The derivative changes from positive to negative, and P(t) tends to negative infinity as t increases without bound.
(d) 162 [3 suggested marks]
At t=9, revenue is 12288×9=216.
Subtract the running cost 6×9=54 to obtain 162 units.
(e) 0≤t≤45 hours. [4 suggested marks]
P(t)=t[t+3288−6]. At t=0 the profit is zero.
For t>0, multiply by the positive denominator: 288−6(t+3)≥0.
This gives t≤6288−3=45. Combine it with the physical domain.
How the topics connect
The rational model supplies a domain, asymptote and marginal revenue; its positivity matters when solving the profit inequality.
A linear running cost changes an always-increasing revenue function into a profit function with a finite optimum.
Water enters a reservoir at rate R(t)=15e−kt litres per minute, where k>0 and t is in minutes. Initially the reservoir contains 24 litres. The inflow rate after 2 minutes is half its initial rate. There is no outflow.
Worked solution
(a) 0.347 [3 suggested marks]
The rate condition gives e−2k=21.
Take natural logarithms: k=2ln(2).
(b) V(t)=24+(k15)(1−e−kt). [4 suggested marks]
The volume increase is the integral of R(t) from 0 to t.
An antiderivative is −(k15)e−kt.
Evaluating the limits and adding the initial volume gives V(t)=24+(k15)(1−e−kt).
(c) 3.41 [4 suggested marks]
Set (k15)(1−e−kt)=30, so e−kt=1−2k=1−ln2.
Thus t=k−ln(1−ln2). Use the unrounded value of k.
The logarithm is defined because 0<ln2<1.
(d) 10.8 [3 suggested marks]
Mean rate = (21)∫0215e−ktdt.
Since e−2k=21, this is 2k215=2ln215 litres per minute.
(e) It will never become full under this model. [3 suggested marks]
As t tends to infinity, e−kt tends to zero, so V(t) tends to 24+ln302≈67.28085123 litres.
This limiting volume is less than the capacity 84 litres.
The volume increases towards that limit, so the capacity cannot be reached.
How the topics connect
An exponential rate is integrated to obtain an accumulating volume with an initial condition.
The volume formula must then be inverted using logarithms and interpreted through its limiting value.
A sensor has raw reading X~N(52,16). Its display Y uses a linear calibration. A raw reading of 48 produces display 79; a raw reading of 56 produces display 95. An alarm sounds when the display exceeds 91. Readings taken for the probability calculations can be assumed independent.
Worked solution
(a) Y=2X−17. [3 suggested marks]
The calibration gradient is 56−4895−79=2.
Substitute either calibration point to obtain the intercept -17.
(b) Mean = 87; standard deviation = 8. [3 suggested marks]
For a linear transformation Y=aX+b, E(Y)=aE(X)+b.
The standard deviation is ∣a∣σ, not a2σ; here a=2>0.
(c) 0.309 [3 suggested marks]
Because the calibration gradient is positive, Y>91 is equivalent to X>54.
Standardise using the raw mean and standard deviation, or use the transformed normal distribution.
(d) 0.128 [4 suggested marks]
Let A be the number of alarms. Then A~B(13,p), with p from part (c).
Use P(A=2)=C(13,2)p2(1−p)11, retaining the unrounded p.
(e) 100 [4 suggested marks]
First find the 95th percentile of X: x0=InvNorm(0.95,52,4).
Transform this raw cutoff with Y=2X−17.
The alarm must use the upper 5% tail, so a 0.05 left-tail inverse would give the wrong boundary.
How the topics connect
Two calibration points define a linear function, which transforms both a normal mean and its spread.
The transformed alarm event becomes the Bernoulli event in a binomial calculation.
A rectangular target is 0≤x≤8, 0≤y≤8. It contains the line y=88x and the curve y=8(8x)4. A point lands uniformly by area in the rectangle. The region above the curve and below the line is called the band. Each independent point in the band wins 13 units; a point below the curve wins 3 units; a point above the line wins nothing.
Worked solution
(a) (0,0) and (8,8). [3 suggested marks]
Set 8x=(8x)4. Let u=8x, so 0≤u≤1.
Then u(1−u3)=0. In this interval only u=0 and u=1 are possible.
(b) 10192 [4 suggested marks]
For 0<x<8, the line is above the curve because 0<8x<1.
Integrate 88x−8(8x)4 from 0 to 8.
The line area is 264 and the area below the curve is 564. Their difference is 10192 square units.
(c) 53 [3 suggested marks]
The area below the line is half the rectangle: 264.
Divide the band area by this restricted area, obtaining 53.
(d) 0.915 [4 suggested marks]
For a point in the whole rectangle, the band probability is area/(LH)=103.
Use X~B(12,p), then compute 1−P(X≤1).
The conditional probability from part (c) must not be used for these unrestricted points.
(e) 1045 [3 suggested marks]
The probabilities of band, below-curve and above-line outcomes are 103, 51, and 21 respectively.
Expected winnings = 1013×3+53.
A fair fee equals these expected winnings.
How the topics connect
The required probability is not given: it must first be constructed from an integral and geometric areas.
Conditional probability, repeated trials and a fair price use different combinations of the same region areas.
Let P=114 cm be the length of a wire. The wire is bent into the complete boundary of a circular sector: two equal radii r and an arc. The angle θ is in radians and satisfies 0<θ<π. The enclosed sector area is A.
An arch has its feet at (0,0) and (6,0), and its highest point at (3,14). Distances are in metres. Its curved edge is modelled by y=kx(6−x). A rectangular window has its base on the x-axis and its two upper corners on the arch, equally far from x=3. Let u be half the width of this window.
Worked solution
(a) 914 [3 suggested marks]
At the highest point, x=3 and y=14.
Hence 14=k×32, so k=914.
(b) A(u)=28u−(928)u3, with 0<u<3. [4 suggested marks]
The upper corners have x-coordinates 3−u and 3+u.
Substitution into the arch gives the height 14(1−9u2).
Multiply this height by the width 2u. Both dimensions are positive exactly when 0<u<3.
(c) Width = 36m. [4 suggested marks]
A′(u)=28−(984)u2.
Setting A′(u)=0 gives u=33, taking the positive root in the physical domain.
A′′(u)=−(9168)u<0 at this value, so the stationary area is a maximum.
The width is 2u=36m.
(d) 33168 [3 suggested marks]
At u=33, the window height is 32H=328.
Multiply by the width 36 to obtain 33168m2.
(e) y=(314)x+414. [3 suggested marks]
The arch is y=(914)(6x−x2), so y′=(914)(6−2x).
At x=23 the gradient is 314, and the point has height 442.
Use y−43H=(aH)(x−2a), then simplify.
How the topics connect
The geometry supplies the domain and the area function; a derivative alone cannot set up the optimisation.
The same quadratic model supplies a tangent through its derivative.
A small vehicle moves on a straight track. Its velocity is v(t)=(21654)t(t−6) metres per second for 0≤t≤12. Its position at t=0 is 60 m. A monitor records position at t=0, t=6 and t=12.
Worked solution
(a) Rest at t=0 and t=6s; acceleration at t=6 is s23654m. [3 suggested marks]
Velocity is negative on 0<t<6 and positive on 6<t<12.
The positions are s(0)=60, s(6)=51, s(12)=96.
Total distance = 9+45=54m. Signed displacement would be only 36 m.
(d) 69 [3 suggested marks]
The readings are 60, 51 and 96.
Their mean is 3207=69m.
(e) 60 [4 suggested marks]
Integrate s(t) again: 60t+(4329)t4−(369)t3.
At the upper endpoint the two variable-motion contributions cancel: 432−432=0.
Dividing the remaining integral 720 by 12 gives 60 m.
(f) Three equally spaced readings are a discrete average; they do not exactly represent the time spent at every position along this non-linear motion. [3 suggested marks]
Part (d) assigns equal weight to only three selected instants.
Part (e) averages continuously over the whole interval.
A non-linear position-time graph need not have the same discrete and continuous averages.
How the topics connect
Integrating a signed velocity is needed to obtain the data that are later averaged.
The question distinguishes a statistical sample mean from a continuous mean calculated by integration.
A factory uses production lines A and B. Line A makes 50% of the items. An A-item is defective with probability 0.03, and a B-item with probability 0.12. A retailer independently samples 12 items from a very large mixed output. Each sound item earns 14 units of revenue; a defective item earns no revenue and incurs a 4-unit disposal charge. Preparing the batch costs 29 units.
Worked solution
(a) 0.075 [3 suggested marks]
Split the event according to its production line.
P(D)=0.5×0.03+0.5×0.12=0.075.
(b) 0.2 [3 suggested marks]
P(A∩D)=0.5×0.03=0.015.
Use P(A|D)=P(D)P(A∩D), with the unrounded answer to part (a).
(c) 0.226 [4 suggested marks]
Let X count defective items. Independence and the fixed defect probability give X~B(12,0.075).
P(X≥2)=1−P(X≤1). Use a binomial cumulative probability.
(d) 123 [3 suggested marks]
With X defective items, the net profit is 14(12−X)−4X−29.
E(X)=np=12×0.075.
Hence expected profit is 168−18E(X)−29.
(e) A defective item is more likely to have come from B. [3 suggested marks]
The conditional probability for A is 0.2, while that for B is 0.8.
Compare these probabilities, not just the proportion made by each line.
The different defect rates change the composition of the defective group.
How the topics connect
The total-probability calculation supplies the success probability for the later binomial model.
Bayes’ rule and the profit function require different interpretations of the same defective-item event.
The water depth at a harbour varies sinusoidally between 5 m and 11 m, with period 20 hours. At t=0 the depth is halfway between these extremes and rising. Let h(t) be the depth, with t in hours and angles in radians. A vessel needs depth at least 8+23m. For probability calculations, arrival times are independent and uniform over a complete 20-hour cycle.
Worked solution
(a) h(t)=8+3sin(10πt). [4 suggested marks]
The midline is 25+11=8, and the amplitude is 3.
A period of 20 requires angular frequency 202π=10π.
The initial midline crossing is rising, so a positive sine model has the required phase.
(b) From t=410×1 to t=410×3 hours, inclusive. [4 suggested marks]
The condition reduces to sin(10πt)≥22.
The two boundary angles in the positive half-cycle are α=4π and π−α.
Convert using t=π10θ. There is no safe interval in the negative-sine half-cycle.
(c) 0.666 [3 suggested marks]
Differentiate h(t): h′(t)=(103π)cos(10πt).
At the first boundary the angle is α. Substitute it, giving units m per hour.
(d) 0.466 [4 suggested marks]
The probability for one uniform arrival is safe-interval length divided by 20: p=0.25.
For X safe arrivals, X~B(6,p).
Compute P(X≥2)=1−P(X≤1).
(e) 10.7 [4 suggested marks]
The mean is (b−a1)∫abh(t)dt, where a and b are the safe times.
Integrate the sine term: −(π30)cos(10πt).
The two endpoint cosines are opposite, giving mean8+π−2α2×3cosα metres.
How the topics connect
The trigonometric inequality supplies both the differentiation point and the probability of a safe arrival.
The same safe interval becomes the pair of limits for amean-value integral.
An event trials four ticket prices p (currency units) and records demand d. The paired observations (p,d) are (2,53), (4,37), (6,27), (8,23). A linear regression of demand on price will be used as a model. Each customer incurs a variable cost of 2 units, and the event has a fixed cost of 19 units.
Worked solution
(a) d=60−5p. [3 suggested marks]
Use the price list as x and the demand list as y in a linear regression.
The fitted gradient is −5 and intercept is 60.
The residual perturbations have zero sum and zero price-weighted sum, so they do not change the underlying fitted line.
A saver deposits 700 units at the end of every year. Interest of 6% is credited annually before the next deposit. Let Bn be the balance immediately after deposit n, with B0=0. Prices rise by 2% each year.
Worked solution
(a) Bn=0.06700((1.06)n−1). [4 suggested marks]
Immediately after deposit n, the deposits are worth D, Dq, ⋯, Dqn−1.
These terms form a geometric series with first term D and ratio q=1.06.
Apply the finite geometric-series formula. The first deposit earns n−1 years of interest.
(b) 6930 [3 suggested marks]
Substitute n=8 into the geometric-series expression.
Retain the full value of q=1.06 and round only at the end.
A rectangular target is 0≤x≤6, 0≤y≤9. It contains the line y=69x and the curve y=9(6x)3. A point lands uniformly by area in the rectangle. The region above the curve and below the line is called the band. Each independent point in the band wins 13 units; a point below the curve wins 2 units; a point above the line wins nothing.
Worked solution
(a) (0,0) and (6,9). [3 suggested marks]
Set 6x=(6x)3. Let u=6x, so 0≤u≤1.
Then u(1−u2)=0. In this interval only u=0 and u=1 are possible.
(b) 8108 [4 suggested marks]
For 0<x<6, the line is above the curve because 0<6x<1.
Integrate 69x−9(6x)3 from 0 to 6.
The line area is 254 and the area below the curve is 454. Their difference is 8108 square units.
(c) 42 [3 suggested marks]
The area below the line is half the rectangle: 254.
Divide the band area by this restricted area, obtaining 42.
(d) 0.92 [4 suggested marks]
For a point in the whole rectangle, the band probability is area/(LH)=82.
Use X~B(15,p), then compute 1−P(X≤1).
The conditional probability from part (c) must not be used for these unrestricted points.
(e) 830 [3 suggested marks]
The probabilities of band, below-curve and above-line outcomes are 82, 41, and 21 respectively.
Expected winnings = 813×2+42.
A fair fee equals these expected winnings.
How the topics connect
The required probability is not given: it must first be constructed from an integral and geometric areas.
Conditional probability, repeated trials and a fair price use different combinations of the same region areas.
The water depth at a harbour varies sinusoidally between 3 m and 11 m, with period 14 hours. At t=0 the depth is halfway between these extremes and rising. Let h(t) be the depth, with t in hours and angles in radians. A vessel needs depth at least 7+24m. For probability calculations, arrival times are independent and uniform over a complete 14-hour cycle.
Worked solution
(a) h(t)=7+4sin(7πt). [4 suggested marks]
The midline is 23+11=7, and the amplitude is 4.
A period of 14 requires angular frequency 142π=7π.
The initial midline crossing is rising, so a positive sine model has the required phase.
(b) From t=47×1 to t=47×3 hours, inclusive. [4 suggested marks]
The condition reduces to sin(7πt)≥22.
The two boundary angles in the positive half-cycle are α=4π and π−α.
Convert using t=π7θ. There is no safe interval in the negative-sine half-cycle.
(c) 1.27 [3 suggested marks]
Differentiate h(t): h′(t)=(74π)cos(7πt).
At the first boundary the angle is α. Substitute it, giving units m per hour.
(d) 0.756 [4 suggested marks]
The probability for one uniform arrival is safe-interval length divided by 14: p=0.25.
For X safe arrivals, X~B(10,p).
Compute P(X≥2)=1−P(X≤1).
(e) 10.6 [4 suggested marks]
The mean is (b−a1)∫abh(t)dt, where a and b are the safe times.
Integrate the sine term: −(π28)cos(7πt).
The two endpoint cosines are opposite, giving mean7+π−2α2×4cosα metres.
How the topics connect
The trigonometric inequality supplies both the differentiation point and the probability of a safe arrival.
The same safe interval becomes the pair of limits for amean-value integral.
A test service operated for t hours generates revenue R(t)=t+6450t units, where t≥0. Running the service costs 3 units per hour. There is no fixed cost.
Worked solution
(a) Limiting revenue 450 units; half is achieved at t=6 hours. [3 suggested marks]
The horizontal asymptote of R is y=450.
Solve t+6450t=2450 to obtain 2t=t+6.
(b) R′(t)=(t+6)22700>0 for t≥0. [3 suggested marks]
Apply the quotient rule: R′=(t+6)2450(t+6)−450t.
The positive derivative means total revenue increases with operating time, although the marginal revenue decreases.
(c) 24 [4 suggested marks]
P(t)=R(t)−3t, so P′(t)=(t+6)22700−3.
Since t+6>0, solving P′=0 gives t+6=32700=30.
Thus t=24. The derivative changes from positive to negative, and P(t) tends to negative infinity as t increases without bound.
(d) 288 [3 suggested marks]
At t=24, revenue is 30450×24=360.
Subtract the running cost 3×24=72 to obtain 288 units.
(e) 0≤t≤144 hours. [4 suggested marks]
P(t)=t[t+6450−3]. At t=0 the profit is zero.
For t>0, multiply by the positive denominator: 450−3(t+6)≥0.
This gives t≤3450−6=144. Combine it with the physical domain.
How the topics connect
The rational model supplies a domain, asymptote and marginal revenue; its positivity matters when solving the profit inequality.
A linear running cost changes an always-increasing revenue function into a profit function with a finite optimum.
An event trials four ticket prices p (currency units) and records demand d. The paired observations (p,d) are (2,62), (4,48), (6,38), (8,32). A linear regression of demand on price will be used as a model. Each customer incurs a variable cost of 1 units, and the event has a fixed cost of 19 units.
Worked solution
(a) d=70−5p. [3 suggested marks]
Use the price list as x and the demand list as y in a linear regression.
The fitted gradient is −5 and intercept is 70.
The residual perturbations have zero sum and zero price-weighted sum, so they do not change the underlying fitted line.
A saver deposits 1000 units at the end of every year. Interest of 7% is credited annually before the next deposit. Let Bn be the balance immediately after deposit n, with B0=0. Prices rise by 1% each year.
Worked solution
(a) Bn=0.071000((1.07)n−1). [4 suggested marks]
Immediately after deposit n, the deposits are worth D, Dq, ⋯, Dqn−1.
These terms form a geometric series with first term D and ratio q=1.07.
Apply the finite geometric-series formula. The first deposit earns n−1 years of interest.
(b) 12000 [3 suggested marks]
Substitute n=9 into the geometric-series expression.
Retain the full value of q=1.07 and round only at the end.
A small vehicle moves on a straight track. Its velocity is v(t)=(21672)t(t−6) metres per second for 0≤t≤12. Its position at t=0 is 30 m. A monitor records position at t=0, t=6 and t=12.
Worked solution
(a) Rest at t=0 and t=6s; acceleration at t=6 is s23672m. [3 suggested marks]
Velocity is negative on 0<t<6 and positive on 6<t<12.
The positions are s(0)=30, s(6)=18, s(12)=78.
Total distance = 12+60=72m. Signed displacement would be only 48 m.
(d) 42 [3 suggested marks]
The readings are 30, 18 and 78.
Their mean is 3126=42m.
(e) 30 [4 suggested marks]
Integrate s(t) again: 30t+(43212)t4−(3612)t3.
At the upper endpoint the two variable-motion contributions cancel: 576−576=0.
Dividing the remaining integral 360 by 12 gives 30 m.
(f) Three equally spaced readings are a discrete average; they do not exactly represent the time spent at every position along this non-linear motion. [3 suggested marks]
Part (d) assigns equal weight to only three selected instants.
Part (e) averages continuously over the whole interval.
A non-linear position-time graph need not have the same discrete and continuous averages.
How the topics connect
Integrating a signed velocity is needed to obtain the data that are later averaged.
The question distinguishes a statistical sample mean from a continuous mean calculated by integration.
Let P=52 cm be the length of a wire. The wire is bent into the complete boundary of a circular sector: two equal radii r and an arc. The angle θ is in radians and satisfies 0<θ<π. The enclosed sector area is A.
Worked solution
(a) θ=r52−2; π+252<r<252. [3 suggested marks]
The wire length is 2r+rθ=52.
Solving gives θ=r52−2.
The restrictions 0<θ<π give r<252 and r>π+252.
(b) A(r)=26r−r2. [2 suggested marks]
Use the sector-area formula A=21r2θ.
Substitute θ=r52−2 and simplify.
(c) 13 [4 suggested marks]
A′(r)=26−2r. Setting it to zero gives r=452=13.
A′′(r)=−2<0, and the resulting θ=2 lies between 0 and π.
(d) θ=2 radians; maximum area=169 cm². [3 suggested marks]
Insert r=13 into 2r+rθ=52 to obtain θ=2.
Then A=21×132×2=169 cm².
(e) 92.2 [4 suggested marks]
The triangle formed by the two radii has area 21r2sinθ.
Subtract it from the sector: segment = 21r2(θ−sinθ).
Use r=13, θ=2 in radian mode to obtain 21×132(2−sin2) cm².
How the topics connect
The perimeter constraint converts sector geometry into a one-variable optimisation problem.
The optimised angle then feeds a trigonometric triangle calculation to distinguish a sector from a segment.
Water enters a reservoir at rate R(t)=14e−kt litres per minute, where k>0 and t is in minutes. Initially the reservoir contains 23 litres. The inflow rate after 6 minutes is half its initial rate. There is no outflow.
Worked solution
(a) 0.116 [3 suggested marks]
The rate condition gives e−6k=21.
Take natural logarithms: k=6ln(2).
(b) V(t)=23+(k14)(1−e−kt). [4 suggested marks]
The volume increase is the integral of R(t) from 0 to t.
An antiderivative is −(k14)e−kt.
Evaluating the limits and adding the initial volume gives V(t)=23+(k14)(1−e−kt).
(c) 10.2 [4 suggested marks]
Set (k14)(1−e−kt)=84, so e−kt=1−6k=1−ln2.
Thus t=k−ln(1−ln2). Use the unrounded value of k.
The logarithm is defined because 0<ln2<1.
(d) 10.1 [3 suggested marks]
Mean rate = (61)∫0614e−ktdt.
Since e−6k=21, this is 2k614=2ln214 litres per minute.
(e) It will never become full under this model. [3 suggested marks]
As t tends to infinity, e−kt tends to zero, so V(t) tends to 23+ln842≈144.1863834 litres.
This limiting volume is less than the capacity 191 litres.
The volume increases towards that limit, so the capacity cannot be reached.
How the topics connect
An exponential rate is integrated to obtain an accumulating volume with an initial condition.
The volume formula must then be inverted using logarithms and interpreted through its limiting value.
A factory uses production lines A and B. Line A makes 30% of the items. An A-item is defective with probability 0.05, and a B-item with probability 0.07. A retailer independently samples 12 items from a very large mixed output. Each sound item earns 15 units of revenue; a defective item earns no revenue and incurs a 6-unit disposal charge. Preparing the batch costs 25 units.
Worked solution
(a) 0.064 [3 suggested marks]
Split the event according to its production line.
P(D)=0.3×0.05+0.7×0.07=0.064.
(b) 0.234 [3 suggested marks]
P(A∩D)=0.3×0.05=0.015.
Use P(A|D)=P(D)P(A∩D), with the unrounded answer to part (a).
(c) 0.177 [4 suggested marks]
Let X count defective items. Independence and the fixed defect probability give X~B(12,0.064).
P(X≥2)=1−P(X≤1). Use a binomial cumulative probability.
(d) 139 [3 suggested marks]
With X defective items, the net profit is 15(12−X)−6X−25.
E(X)=np=12×0.064.
Hence expected profit is 180−21E(X)−25.
(e) A defective item is more likely to have come from B. [3 suggested marks]
The conditional probability for A is 0.234375, while that for B is 0.765625.
Compare these probabilities, not just the proportion made by each line.
The different defect rates change the composition of the defective group.
How the topics connect
The total-probability calculation supplies the success probability for the later binomial model.
Bayes’ rule and the profit function require different interpretations of the same defective-item event.
A business offers an item to 44 independent potential customers. At price t units, each buys with probability 1−24t, for 0≤t≤24. The item costs 4 units per sale and the business has a fixed cost of 30 units. Let X be the number of sales and Π the net profit.
An arch has its feet at (0,0) and (14,0), and its highest point at (7,7). Distances are in metres. Its curved edge is modelled by y=kx(14−x). A rectangular window has its base on the x-axis and its two upper corners on the arch, equally far from x=7. Let u be half the width of this window.
Worked solution
(a) 497 [3 suggested marks]
At the highest point, x=7 and y=7.
Hence 7=k×72, so k=497.
(b) A(u)=14u−(4914)u3, with 0<u<7. [4 suggested marks]
The upper corners have x-coordinates 7−u and 7+u.
Substitution into the arch gives the height 7(1−49u2).
Multiply this height by the width 2u. Both dimensions are positive exactly when 0<u<7.
(c) Width = 314m. [4 suggested marks]
A′(u)=14−(4942)u2.
Setting A′(u)=0 gives u=37, taking the positive root in the physical domain.
A′′(u)=−(4984)u<0 at this value, so the stationary area is a maximum.
The width is 2u=314m.
(d) 33196 [3 suggested marks]
At u=37, the window height is 32H=314.
Multiply by the width 314 to obtain 33196m2.
(e) y=(77)x+47. [3 suggested marks]
The arch is y=(497)(14x−x2), so y′=(497)(14−2x).
At x=27 the gradient is 77, and the point has height 421.
Use y−43H=(aH)(x−2a), then simplify.
How the topics connect
The geometry supplies the domain and the area function; a derivative alone cannot set up the optimisation.
The same quadratic model supplies a tangent through its derivative.
A sensor has raw reading X~N(67,36). Its display Y uses a linear calibration. A raw reading of 61 produces display 180; a raw reading of 73 produces display 216. An alarm sounds when the display exceeds 207. Readings taken for the probability calculations can be assumed independent.
Worked solution
(a) Y=3X−3. [3 suggested marks]
The calibration gradient is 73−61216−180=3.
Substitute either calibration point to obtain the intercept -3.
(b) Mean = 198; standard deviation = 18. [3 suggested marks]
For a linear transformation Y=aX+b, E(Y)=aE(X)+b.
The standard deviation is ∣a∣σ, not a2σ; here a=3>0.
(c) 0.309 [3 suggested marks]
Because the calibration gradient is positive, Y>207 is equivalent to X>70.
Standardise using the raw mean and standard deviation, or use the transformed normal distribution.
(d) 0.064 [4 suggested marks]
Let A be the number of alarms. Then A~B(12,p), with p from part (c).
Use P(A=1)=C(12,1)p1(1−p)11, retaining the unrounded p.
(e) 228 [4 suggested marks]
First find the 95th percentile of X: x0=InvNorm(0.95,67,6).
Transform this raw cutoff with Y=3X−3.
The alarm must use the upper 5% tail, so a 0.05 left-tail inverse would give the wrong boundary.
How the topics connect
Two calibration points define a linear function, which transforms both a normal mean and its spread.
The transformed alarm event becomes the Bernoulli event in a binomial calculation.